Power Supply with Short Lead Time
Are you experiencing long lead times with power supplies? Then ADM could help you.
Power Supplies Stocked in Australia
ADM stocks a wide range of power supplies from reputable manufacturers such as MEAN WELL, Adel System and Power Source.
Our main warehouse is located alongside our head office in Dingley Village, Melbourne. This warehouse receives all incoming shipments and redistributes products to our three satellite warehouses:
- Hornsby, Sydney
- Wangara, Perth
- Brendale, Brisbane
We have extended our forecast window to ensure that our stock levels are maintained.
Our range of power supplies is extensive, so there is a strong likelihood that we will have a suitable power supply for your application in stock.
We keep stock of the most used power supplies at all four warehouses. More specialised items may only be carried in one or two locations.
If there is an item that you would like to see stocked at your local ADM warehouse, then please do not hesitate to contact ADM, or the branch representative below. This service is particularly useful if you often experience instances of unforeseen demand that needs to be fulfilled on the same day.
Warehouse |
Representative |
Email Address |
---|---|---|
Dingley Village, Melbourne |
Adam Bellani |
adamb@admtech.com.au |
Hornsby, New South Wales |
Samir Khan | samirk@admtech.com.au |
Wangara, Perth |
Sheree Astill | sheree@admtech.com.au |
Brendale, Brisbane |
Stephen Lilley | stephenl@admtech.com.au |
Railway and Custom Industrial Power Supplies
ADM is proud to represent Premium power supplies in Australia.
Premium is a European power supply manufacturer offering both standard products and customised industrial and railway power supplies.
Premium has been able to keep lead times on track by adopting several measures:
- Agile and proactive qualification and approval of alternate options a specific component cannot be sourced.
- Premium’s designs have a second component specified to mitigate supply chain problems.
- Quick and consensual modifications to custom solutions.
If you are looking for a custom power solution that does not involve excessively long lead times, then please contact ADM.
IS THIS INFORMATION USEFUL?
If so, why not share it with your peers and colleagues. Simply click on the blue LinkedIn share icon below.